On August 23, a large-diameter shield machine with a cutter head painted with a lion pattern rolled off the assembly line at the First Changsha Industrial Park, China Railway Construction Heavy Industry Corporation Limited (CRCHI). It has an excavation diameter of 13.42 meters, a total length of 130 meters, and a total weight of 3800 tons. It will participate in the construction of the Pearl River Mouth Tunnel Project of the Shenzhen-Jiangmen Railway, the deepest subsea tunnel in China. The shield machine is named “Shenjiang No. 1” and is jointly built by CRCHI and China Railway 14th Bureau Group Co., Ltd. (Photo/Hu Qing)
This article is from Hunan Provincial Government
www.enghunan.gov.cn.
Translator: Yu Jiangjiang
Chinese source: hunantoday