Hunan Changsha Local Forecast: 2009/4/21 ( Tue ) Daytime Partly Cloudy 28 C°<3 Level Night Partly Cloudy 19 C°<3 Level 中文

  Projects

Construction of Wastewater Treatment Plant in New East Area of Yiyang Hi-tech Zone

Project owner: Yiyang Hi-tech Industry Assets Management Company

 

Address: 1# Zishan Road, Yiyang City, Hunan

 

Project content: Close to the provincial capital of Changsha and located at the exit of Changsha-Zhangjiajie Expressway, New East Area of Yiyang Hi-tech Zone is 40km away from Changsha, 20km away from Yiyang Port and 60km away from Changsha Huanghua International Airport, and links Changsha Yuelu Valley and west industrial corridor of Ningxiang and Wangcheng. It is an important part of the Changsha-Zhuzhou-Xiangtan city group, which is approved by the State Council as a comprehensive coordinated reform experimental region for the construction of “resource saving and environment friendly” society. With a medium and long-term planned area of 140km2, this area shall be built into a new industrial city of Yiyang. The near-term planned area is 12km2. The Municipal Party Committee and Municipal Government have made a decision to build New East Area of Yiyang Hi-tech Zone into a core area for accepting the gradient transfer of processing trade, it shall focus on accepting the six industries including new material, new energy, equipment manufacture, electronic information, clothes, shoes and caps and food processing. Yiyang’s industrial group shall be enlarged and strengthened. New East Area of Yiyang Hi-tech Zone has become an ideal place for the gradient industry transfer.

 

At present, the wastewater discharged by the enterprises and residents in New East Area mainly flows into Yiyang City Wastewater Treatment Plant for treatment through the main sewage pipe. Since Yiyang City Wastewater Treatment Plant is far from New East Area and lacks sufficient treatment capacity, partial enterprises have to discharge wastewater without treatment, this has seriously impacted the environment of New East Area. Therefore, we intend to absorb funds for the construction of a wastewater treatment plant in New East Area. The project has a design treatment capacity of 200,000t/d, a near-term catchment area of 10km2 and a long-term catchment area of 20km2. Currently, we are implementing the early-stage preparation work. The project enjoys relevant preferential policies granted by the central government, provincial government, municipal government and Hi-tech Zone.

Total investment: USD 28.57 million.

 

Cooperation means: joint venture, cooperative management, exclusive management.

 

Liaison person: Gui Shiping

 

Liaison phone: 0737-6204863 6204881